![]() |
中标分类
行业分类
ICS分类
最新标准
|
登录注册 |
您的位置: 标准明细 |
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. This standard is developed in accordance with the rules given in GB/T 1.1-2009 Directives for standardization—Part 1: Structure and drafting of standards. This standard replaces the parts related to metallurgic and chemical limestone and cement-materials in DZ/T 0213-2002 Specifications for metallurgic, chemical limestone and dolomite, cement-materials mineral exploration. The following main technical changes have been made with respect to DZ/T 0213-2002: ——The contents about dolomite are deleted; ——The pre-exploration stage is canceled, and the connotation of each exploration stage is modified according to GB/T 17766-2020 Classifications for mineral resources and mineral reserves (see Clause 4); ——Some contents of technical conditions for mining deposits are modified (see 4.1.5, 4.2.5 and 4.3.5); ——The requirements for exploration depth are added (see 5.2.2); ——The requirements for the proportion of resources to be identified during the detailed exploration and advanced exploration stages are added (see 5.3.2, 5.3.3 and Annex D); ——The clause “green exploration requirements” is added (see Clause 6); ——Some subclauses in the “exploration work and quality requirements” are modified (see Clause 7); ——The requirements of “feasibility evaluation” are modified (see Clause 8); ——The specific conditions for the resources and reserves type are added (see Clause 9); ——The requirements for resources and reserves estimation are modified (see Clause 10); ——The commercial type of deposit, classification of structural characteristics of limestone, and classification of deposit size are added (see Annex A); ——The exploration types and engineering spacing of cement ingredient deposit are added (see Annex C); ——The Annex A is modified, and the "classifications for mineral resources and mineral reserves" is modified to "types of resources and reserves and their conversion relation" (see Annex F); ——The general requirements for chemical composition of some ores are modified and added (see Annex G). This standard was proposed by the Ministry of Natural Resources of the People's Republic of China. This standard is under the jurisdiction of National Technical Committee on Natural Resources and Territory Spatial Planning of Standardization Administration of China (SAC/TC 93). The previous edition of this standard is as follows: ——DZ/T 0213-2002. Specifications for mineral exploration —Limestone and cement ingredients 1 Scope This standard specifies the requirements in terms of the purpose and stage of mineral geological exploration, degree of exploration research, degree of exploration control, green exploration, exploration work and its quality, feasibility evaluation, resource reserve type conditions, resource reserve estimation, etc. of limestone and cement ingredients1). This standard is applicable to geological exploration, resource reserve estimation and achievement evaluation of limestone and cement ingredient minerals in various stages. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB 6566 Limits of radionuclides in building materials GB 6722 Safety regulations for blasting GB/T 12719 Exploration specification of hydrogeology and engineering geology in mining areas GB/T 13908 General requirements for solid mineral exploration GB/T 17766 Classifications for mineral resources and mineral reserves GB 18306 Seismic ground motion parameters zonation map of China GB/T 18341 Specifications of survey for geological and mineral resources exploration GB/T 25283 Specification for comprehensive exploration and evaluation of mineral resources GB/T 33444 Specification for exploration of solid mineral resources GB 50295 Code for design of cement plant DZ/T 0033 Specifications for compilation of geological reports on mineral exploration DZ/T 0078 Procedures for original geological record of solid mineral exploration DZ/T 0079 Technical requirements of integrated compilation and study on geological data about solid mineral exploration DZ/T 0130 (All parts) The specification of testing quality management for geological laboratories DZ/T 0227 Geological core drilling regulations DZ/T 0276 (All parts) Regulation for testing the physical and mechanical properties of rock DZ/T 0336 Specifications for scoping study of mineral exploration DZ/T 0338 (All parts) Regulations of mineral resources estimation DZ/T 0339 Requirements for study of deposit industrial criteria DZ/T 0340 Requirements for mineral processing test degree in mineral exploration 3 Purpose and stage of exploration 3.1 Purpose The purpose is to find and evaluate the deposits (bodies) that can be further explored or exploited, provide relevant geological information for exploration or development decisions, and finally provide necessary geological data for mine construction design, so as to reduce the investment risk of deposit exploration and development and obtain reasonable economic benefits. 3.2 Classification of exploration stages and the objectives and tasks of each stage 3.2.1 Classification of exploration stages According to GB/T 17766 and GB/T 13908, the exploration work of limestone and cement ingredient minerals can be classified into three stages: general exploration, detailed exploration and advanced exploration, which shall be carried out step by step. When merging or submitting exploration results across stages, it should also be implemented step by step with reference to the requirements of exploration stages. 3.2.2 General exploration stage On the basis of regional geological survey and research, search for, inspect and trace ore bearing geological bodies and find ore bodies through effective exploration means (geological mapping, trenching, shallow well or shallow drilling, drilling); preliminarily identify the geological characteristics of ore bodies (beds) and ore processing technical performance; preliminarily understand the mining technical conditions through sparse sampling engineering control and testing, experimental research; and conduct a rough study in order to estimate and infer the amount of resources, and evaluate whether it is necessary to transfer to detailed exploration, and propose the scope for detailed exploration. 3.2.3 Detailed exploration stage On the basis of general exploration, conduct systematic engineering control, testing and experimental research on the ore body through effective exploration means to basically identify the geological characteristics of the deposit (body), the technical performance of ore processing and the technical conditions for mining, so as to provide a geological basis for the division of mining areas and the determination of exploration areas; conduct a general study in order to estimate the amount of controlled resources and inferred resources, and evaluate whether it is necessary to transfer to exploration, and propose the scope of exploration; pre-feasibility study or feasibility study may also be carried out to estimate credible reserves. 3.2.4 Advanced exploration stage On the basis of detailed exploration, and through effective exploration means, the ore body shall be subject to infilling engineering control and test as well as in-depth test and study in order to identify the geological characteristics of the ore body, the technical performance of ore processing and the mining technical conditions in detail, so as to provide the necessary geological data for the mine construction design to determine the mine production size, mining method, and the general layout of the mine; conduct a general study in order to estimate the inferred, controlled and proved resources; pre-feasibility study or feasibility study may also be carried out to estimate credible reserves and proved reserves. 4 Exploration research degree 4.1 General exploration stage 4.1.1 Geology of exploration area 4.1.1.1 Collect regional geological data as comprehensively and timely as possible, especially the data related to geological, mineral, geophysical, remote sensing, prospecting engineering and sampling test (test), and exploration and mining data of the same mineral mines, latest research results, etc., and make use of them on the basis of full research. 4.1.1.2 Through geological mapping (generally simple mapping) with a scale of 1:10000 or 1:5000, using outcrop inspection, and with the help of existing engineering exposure, preliminarily identify the spatial distribution of ore bed, large folds, fault and joint fissure development sections, the number, type and distribution of magmatic rock and metamorphic rock, and study the impact of topography on the exploration area boundary and mining slope. 4.1.2 Ore body characteristics 4.1.2.1 As required, a simple geological survey or a preliminary survey of the deposit with a scale of 1:2000 to 1:1000 shall be carried out to preliminarily identify the number, shape, size, occurrence, thickness and overall distribution range of the ore body (bed), and preliminarily identify the number, type, distribution and main chemical composition of the dunn bass. 4.1.2.2 Where there are multiple layers of dolomite or dolomitic limestone in the limestone bed for cement, it should be circled by geological mapping. 4.1.2.3 Have a general understanding of the types and main chemical compositions of the surrounding rocks of the ore body, preliminarily identify the distribution, types and thickness of the overburden of the ore body, and preliminarily identify the morphological characteristics, size and distribution range of limestone karst. 4.1.3 Ore characteristics By comparing the sampling identification (rock ore identification), testing and analysis of the sparse project with the known deposits with similar geological characteristics, the ore type, mineral composition, chemical composition, grade and distribution; the grain size of clay raw materials and siliceous raw materials, the plasticity of clay raw materials; and the depth and distribution range of the ore body weathering zone are all preliminarily identified. The commercial type of deposit, classification of structural characteristics of limestone, and classification of deposit size are shown in Annex A. 4.1.4 Test requirements for ore processing technology Generally, the comparison study of ore processing technology is carried out to preliminarily identify the processing technical performance of ore. 4.1.5 Technical conditions of exploitation 4.1.5.1 Collect and analyze regional hydrogeology, engineering geology and environmental geology data, and traffic, power supply and other construction conditions data, and preliminarily identify the hydrogeology, engineering geology and environmental geology conditions of limestone exploration area. 4.1.5.2 When selecting limestone exploration area for cement, it is generally required that the mine is located within 20 km to 50 km of railway (highway) or navigable river and seaport wharf, and the energy required for production must be guaranteed. There shall be industrial sites suitable for building factories near the mines, and they shall be far away from cities, scenic spots, historical sites and large residential areas. There must be clay and siliceous raw material mines for cement nearby (within 20 km to 50 km), which must be implemented at the same time as limestone mines. 4.1.6 Comprehensive exploration and evaluation The occurrence characteristics of symbiotic minerals and the possibility of comprehensive utilization shall be preliminarily identified. The requirements specified in GB/T 25283 apply. Foreword i 1 Scope 2 Normative references 3 Purpose and stage of exploration 3.1 Purpose 3.2 Classification of exploration stages and the objectives and tasks of each stage 4 Exploration research degree 4.1 General exploration stage 4.2 Detailed exploration stage 4.3 Advanced exploration stage 5 Exploration control degree 5.1 Determination of exploration type 5.2 Determination of exploration engineering spacing 5.3 Control degree of deposit 6 Green exploration requirements 6.1 Basic requirements 6.2 Exploration design 6.3 Exploration and construction 6.4 Environmental restoration, treatment and acceptance 7 Exploration work and quality requirements 7.1 Exploration and measurement 7.2 Geological mapping 7.3 Hydrogeological, engineering geological and environmental conditions 7.4 Geophysical prospecting work 7.5 Exploration engineering 7.6 Sample collection, processing and test 7.7 Rock and ore physical properties test 7.8 Original geological record, comprehensive data arrangement and report preparation 8 Feasibility evaluation 8.1 Basic requirements 8.2 Geological study 8.3 Pre-feasibility study 8.4 Feasibility study 9 Resources and reserves type conditions 9.1 Resources 9.2 Reserves 10 Resources and reserves estimation 10.1 Industrial index 10.2 Basic requirements for resources estimation 10.3 Basic requirements for reserves estimation 10.4 Determination of resources and reserves type 10.5 Estimation results of resources and reserves Annex A (Informative) Commercial types of deposits, classification of structural characteristics of limestone, and classification of deposit size Annex B (Informative) Exploration types and engineering spacing of limestone deposits Annex C (Informative) Exploration types and engineering spacing of cement ingredient deposit Annex D (Informative) The amount and proportion of resources explored at each deposit exploration stage Annex E (Informative) Chemical analysis items and allowable limit coefficient of relative deviation of inspection and analysis Annex F (Informative) Types of resources and reserves and their conversion relation Annex G (Informative) General industrial indexes Bibliography 矿产地质勘查规范 石灰岩、水泥配料类 1 范围 本标准规定了石灰岩、水泥配料类1)矿产地质勘查目的及勘查阶段、勘查研究程度、勘查控制程度、绿色勘查、勘查工作及其质量、可行性评价资源储量类型条件、资源储量估算等要求。 1) 水泥配料类包括水泥用黏土质原料和水泥用硅质原料。水泥用黏土质原料包括黏土、黄土、红土、泥岩、页岩和板岩;水泥用硅质原料包括砂、砂岩、石英岩和脉石英。 本标准适用于石灰岩、水泥配料类矿产各阶段的地质勘查工作、资源储量估算及成果评价。 2 规范性引用文件 下列文件对于本文件的应用是必不可少的。凡是注日期的引用文件,仅注日期的版本适用于本文件。凡是不注日期的引用文件,其最新版本(包括所有的修改单)适用于本文件。 GB 6566 建筑材料放射性核素限量 GB 6722 爆破安全规程 GB/T 12719 矿区水文地质工程地质勘探规范 GB/T 13908 固体矿产地质勘查规范总则 GB/T 17766 固体矿产资源储量分类 GB 18306 中国地震动参数区划图 GB/T 18341 地质矿产勘查测量规范 GB/T 25283 矿产资源综合勘查评价规范 GB/T 33444 固体矿产勘查工作规范 GB 50295 水泥工厂设计规范 DZ/T 0033 固体矿产地质勘查报告编写规范 DZ/T 0078 固体矿产勘查原始地质编录规程 DZ/T 0079 固体矿产勘查地质资料综合整理综合研究技术要求 DZ/T 0130 (所有部分) 地质矿产实验室测试质量管理规范 DZ/T 0227 地质岩心钻探规程 DZ/T 0276 (所有部分) 岩石物理 力学性质试验规程 DZ/T 0336 固体矿产勘查概略研究规范 DZ/T 0338(所有部分) 固体矿产资源量估算规程 DZ/T 0339 矿床工业指标论证技术要求 DZ/T 0340 矿产勘查矿石加工选冶技术性能试验研究程度要求 3 勘查目的及勘查阶段 3.1 勘查目的 发现和评价可供进一步勘查或开采的矿床(体),为勘查或开发决策提供相关地质信息,最终为矿山建设设计提供必需的地质资料,以降低矿床勘查开发的投资风险,获得合理的经济效益。 3.2 勘查阶段划分和各阶段目的任务 3.2.1 勘查阶段划分 石灰岩、水泥配料类矿产勘查工作,按GB/T 17766、GB/T 13908分为普查、详查勘探三个阶段,一般应按阶段循序渐进地进行。合并或者跨阶段提交勘查成果时,也宜参照勘查阶段要求分步实施。 3.2.2 普查阶段 在区域地质调查研究的基础上,通过有效的勘查手段(地质填图、探槽、浅井或浅钻、钻探),寻找、检查追索含矿地质体,发现矿体,并通过稀疏的取样工程控制和测试、试验研究,初步查明矿体(床)地质特征以及矿石加工技术性能,初步了解开采技术条件。开展概略研究,估算推断资源量,做出是否有必要转入详查的评价,并提出可供详查的范围。 3.2.3 详查阶段 在普查的基础上,通过有效的勘查手段,对矿体进行系统工程控制和测试、试验研究,基本查明矿床(体)地质特征、矿石加工技术性能以及开采技术条件,为划分矿区、确定勘探区等提供地质依据。开展概略研究,估算控制资源量和推断资源量,做出是否有必要转入勘探的评价,并提出可供勘探的范围;也可开展预可行性研究或可行性研究,估算可信储量。 3.2.4 勘探阶段 在详查的基础上,通过有效的勘查手段,对矿体进行加密工程控制和测试、深入试验研究,详细查明矿体地质特征、矿石加工技术性能以及开采技术条件,为矿山建设设计确定矿山生产规模.开采方式,以及矿山总体布置等提供必需的地质资料。开展概略研究,估算推断资源量、控制资源量、探明资源量;也可开展预可行性研究或可行性研究,估算可信储量、证实储量。 4 勘查研究程度 4.1 普查阶段 4.1.1 勘查区地质 4.1.1.1 尽可能全面、及时地收集区域地质资料,特别是普查区及其周边的地质、矿产、物探、遥感、探矿工程、取样测试(试验)资料、同矿种矿山探采资料、最新研究成果等,并在充分研究的基础上加以利用。 4.1.1.2 通过比例尺为1:10000或1:5000的地质填图(一般为简测图),露头检查,并借助已有工程揭露,初步查明含矿层位的空间展布,较大的褶皱,断层及节理裂隙发育地段,岩浆岩和变质岩数量、种类及分布情况,研究地形地貌对勘查区边界和开采边坡的影响。 4.1.2 矿体特征 4.1.2.1 根据需要应开展比例尺为1:2000~1:1000的矿床地质简测或草测,初步查明矿体(层)数量、形态、规模、产状、厚度及总体分布范围,初步查明夹石的数量、种类、分布、主要化学成分。 4.1.2.2 对水泥用石灰岩矿层中夹有多层白云岩或白云岩化石灰岩时,宜通过地质填图圈出。 4.1.2.3 大致了解矿体围岩种类、主要化学成分,初步查明矿体覆盖层的分布、种类与厚度,初步查明石灰岩岩溶形态特征、规模及分布范围。 4.1.3 矿石特征 通过稀疏工程的取样鉴定(岩矿鉴定)、测试、分析,与地质特征相似的已知矿床进行类比,初步查明矿石类型、矿物成分、化学成分、品级及分布,初步查明黏土2)质原料和硅质原料的粒度、黏土质原料的塑性,初步查明矿体风化带的深度及分布范围。矿床工业类型.石灰岩结构特征分类、矿床规模划分参见附录A。 2) 黏土,旧称粘土。 4.1.4 矿石加工技术试验要求 一般进行矿石加工技术类比研究,初步查明矿石的加工技术性能。 4.1.5 开采技术条件 4.1.5.1 收集分析区域水文地质、工程地质、环境地质资料及交通、供电等建设条件资料,初步查明石灰岩勘查区水文地质、工程地质、环境地质条件。 4.1.5.2 选择水泥用石灰岩勘查区时,一般要求矿山位于铁路(公路)或通航河流与海港码头20km~50km范围内,生产所需的能源要有保证。矿山近旁要有适于建厂的工业场地,并且距城市、风景区、古迹和大型居民区较远。必须就近(20km~50km内)有水泥用黏土质和硅质原料矿山,其必须与石灰岩矿山同时落实。 4.1.6 综合勘查、综合评价 初步查明共生矿产赋存特点和综合利用的可能性。具体按GB/T 25283执行。 4.2 详查阶段 4.2.1 勘查区地质 4.2.1.1 资料收集 全面收集区域地质资料,特别是详查区及其周边的地质、矿产、探矿工程、取样测试(试验)资料,同矿种矿山探采资料及最新研究成果等,并在充分研究的基础上加以利用。 4.2.1.2 地层 4.2.1.2.1 在普查的基础上,一般通过比例尺为1:10000~1:5000的勘查区地质填图(正测图)、比例尺为1:5000~1:1000的矿床地质填图(正测图),结合工程揭露,应基本查明地层的岩性、岩性组合,建立标志层,确定含矿(控矿)地层,基本查明矿体赋存层位。 4.2.1.2.2 对洪积冲积型黏土矿床和风化残积型黏土矿床,宜研究地形地貌和开采标高与成矿的关系。 4.2.1.2.3 对于滨海沉积石英砂矿床,宜研究海成阶地与石英砂矿体的关系。 4.2.1.3 构造 4.2.1.3.1 研究矿区构造与矿体空间分布关系,基本查明对矿体影响较大的褶皱、断层3)和破碎带的规模、产状及对矿体的破坏程度,基本查明节理裂隙的性质、产状、分布规律。 3) 落差(褶幅)大于或等于30m(缓倾斜矿体大于或等于20m)的褶皱、断层构造。 4.2.1.3.2 对位于飞来峰(构造推覆体)中的石灰岩矿体,宜基本控制主推覆断裂。 4.2.1.4 岩浆岩 基本查明对矿体影响较大的岩浆岩(包括脉岩)的种类、规模、产状、矿物成分、化学成分及对矿体的破坏程度。 4.2.1.5 变质岩 基本查明变质岩的种类形态、规模、产状、矿物成分、化学成分、分布规律,研究变质作用的性质、范围。 4.2.2 矿体地质 4.2.2.1 矿体特征 在普查的基础上,对矿体进行系统的取样工程控制,基本查明矿体(层)数量、空间位置、分布规律、形态、规模、产状、厚度及其变化规律。 4.2.2.2 矿体夹石、岩溶、围岩和覆盖层 4.2.2.2.1 夹石 基本查明矿体中夹石的数量、种类、形态、规模、产状、厚度、分布规律,基本查明夹石的化学成分、矿物成分、结构、构造,对夹有多层白云岩或白云岩化石灰岩的水泥用石灰岩矿层,地表应采用取样工程圈定其范围,对其延深用钻探取样控制,对水泥用黏土质和硅质原料矿床(内陆河湖相沉积砂岩和泥岩矿床)中的砾石夹层宜通过地质填图圈定,与矿层界线应有工程控制。 4.2.2.2.2 岩溶 研究石灰岩岩溶的形态、规模、分布范围和变化规律,研究岩溶充填程度、充填物种类、矿物成分和化学成分及其对矿石质量和开采的影响。 4.2.2.2.3 围岩 初步查明矿体围岩的种类、主要化学成分、矿物成分、厚度、产状接触关系,对洪积冲积黏土矿床、风化残积型黏土矿床和滨海沉积石英砂矿床,宜用钻探工程控制矿体底板(基岩)。 4.2.2.2.4 覆盖层 基本查明覆盖层的分布规律、厚度变化。研究覆盖层的种类、物理性质、矿物成分、化学成分及胶结程度。当矿区覆盖层分布面积较大且厚度大于2m时,要编制覆盖层等厚线图。 4.2.3矿石特征 4.2.3.1 基本查明矿物成分结构、构造及矿石类型、品级、所占比例和空间分布规律;基本查明矿石化学成分及有用、有害组分在矿床和矿体中的空间变化规律。 4.2.3.2 脱硫用石灰岩中方解石矿物结晶颗粒以微晶、泥晶为主,应注重对矿石结构特征进行评价。 4.2.3.3 研究黏土质原料和硅质原料的粒度、矿物成分、含水率、化学成分及黏土质原料的塑性。 4.2.3.4 基本查明矿体风化带的深度、分布范围及风化带中矿石的物理性质、化学成分、风化作用对矿石质量及开采的影响。 4.2.4 矿石加工试验要求 4.2.4.1 一般要求 根据需求或参照同类型矿石的工业利用方向,进行矿石加工试验,具体按DZ/T 0340执行。 4.2.4.2 熔剂用、电石用石灰岩加工试验要求 4.2.4.2.1 耐磨、耐压试验。熔剂用石灰岩一般做此项试验。试样规格为5cm×5cm×5cm。 4.2.4.2.2 煅烧试验。黑色冶金熔剂用、电石用石灰岩烧石灰一般做此项试验,用来判断能否获得合格的块度,试验成果往往取决于石灰岩的热裂性能。一般采用半工业规模试验。如果已有类似加工技术方面的数据,可通过类比确定。 4.2.4.2.3 水洗试验。用于清除含泥率较高的矿石中的有害杂质,不致因含泥高而影响生产,影响矿石质量。通过水洗试验确定是否增加洗矿设备,目的是提高矿石质量,确保矿石经破碎、磨矿后能满足要求。 4.2.4.3 水泥原料工艺性能试验要求 4.2.4.3.1 通过试验验证新类型矿石利用的可能性,水泥用石灰岩工艺性能试验应进行实验室规模试验,新类型石灰岩还应进行半工业规模试验,由主体设计单位根据原料资源条件和生产方法等编制取样设计书,取样设计书包括样品种类、质量要求及样品重量4),试样应具有代表性。 4) 人民生产、生活和贸易中,质量习惯称为重量。 4.2.4.3.2 在原料工艺性能试验项目中,应包括可磨性、磨蚀性、易磨性等试验,采用辊式磨时,宜进行辊式磨磨蚀性和易磨性试验,对湿黏性物料宜做塑性指数试验。按GB 50295执行。 4.2.5 开采技术条件 4.2.5.1 水文地质 4.2.5.1.1 对地下水位以上露天开采的矿床,收集气象资料,调查勘查区及其附近地表水体和当地最高洪水位标高,基本查明采场地表汇水边界及自然排水条件。 4.2.5.1.2 对地下水位以下露天开采或井下开采的矿床,除进行上述工作外,还应基本查明含(隔)水层的产状、厚度、分布、裂隙、构造破碎带发育程度及富水性,研究岩溶发育特征(岩溶形态、发育程度及分布规律),基本查明地下水的补给径流排泄条件及大气降水、地表水体的水力联系和对矿床开采的影响程度,调查周边开采矿山的分布和老窿采空区的积水情况。预测计算矿坑涌水量,对矿坑水综合利用的可能性做出评价。基本确定水文地质勘查类型,评价水文地质条件的复杂程度。指出供水水源方向。按GB/T 12719执行。 4.2.5.2 工程地质 4.2.5.2.1 划分矿区工程地质岩组,采样测试主要岩石、矿石物理力学性质。 4.2.5.2.2 基本查明岩石风化程度,基本查明构造、软弱夹层分布规律及其工程地质特征,初步划分各级结构面并阐述其特征。 4.2.5.2.3 基本查明矿床开采影响范围内岩石、矿石稳固性和露天开采场边坡稳定性,基本确定工程地质勘查类型,评价工程地质条件的复杂程度。 4.2.5.3 环境地质 4.2.5.3.1 收集勘查区地震活动历史情况及新构造活动特征,对区域稳定性做出评价。 4.2.5.3.2 调查勘查区内地质灾害发育情况,以及地表水、岩石、矿石、地下水中对人体健康、生态环境有害的元素、放射性核素及其他有害气体组分、含量,调查勘查区地质环境现状并做出评价,预测矿床开采对地质环境可能造成的影响(如:是否影响自然保护区、水源地保护区及基本农田,矿山开采引发的崩塌、滑坡及泥石流地质灾害,疏干排水引发的岩溶地表塌陷及井、泉干涸,水体污染等),并提出防治措施建议。基本确定勘查区地质环境质量类别。 4.2.6 综合勘查、综合评价 4.2.6.1 根据勘查区所在地的工业需求,遵循优质优用和充分利用资源的原则,基本查明共生矿产矿体特征、矿石质量及围岩特征,对其工业利用性做出评价。 4.2.6.2 对水泥用石灰岩矿床中CaO含量小于或等于45%的石灰质原料也应重视,特别是矿区内有高品位矿石时或外购到高品位矿石时,应基本查明这种泥灰岩(特别是低钙高硅者),对能否搭配使用做出评价。 4.2.6.3 对水泥用石灰岩矿床中的夹层、围岩及覆盖层等岩石质物料,对能否搭配使用宜做出评价。 4.2.6.4 对水泥用石灰岩矿床中的裂隙土、岩溶充填物及覆盖土能否搭配使用做出评价。 4.2.6.5 对熔剂用和水泥用石灰岩互层状产出的,宜对矿层分层开采及矿石贫化影响做出评价。 4.2.6.6 对洪积冲积型黏土矿床(往往黏土质与硅质原料矿床共生),应基本查明两种原料的矿体形态和相互关系。 4.3 勘探阶段 4.3.1 勘查区地质 4.3.1.1 资料收集 全面收集区域地质资料,特别是勘探区及周边的地质、矿产、探矿工程、取样测试(试验)资料,同矿种矿山探采资料及最新研究成果等,并在充分研究的基础上加以利用。 4.3.1.2 地层 4.3.1.2.1 在详查的基础上,视需要修测勘查区地质图、矿床地质图(均应为正测图),或开展更大比例尺的地质填图(正测图),结合工程加密控制和揭露情况详细查明地层岩性特征、厚度变化、产状变化和分布特征,详细划分地层层序、岩性组合,接触关系。 4.3.1.2.2 详细查明矿体赋存层位及矿体在地层中的空间分布,研究沉积岩相的物质组成与成矿的关系,研究沉积环境与成矿的关系。 4.3.1.2.3 对洪积冲积黏土矿床和风化残积型黏土矿床,详细查明地形地貌和开采标高与成矿的关系。 4.3.1.2.4 对于滨海沉积石英砂矿床,详细查明海成阶地与石英砂矿体的关系。 4.3.1.3 构造 4.3.1.3.1 详细查明对矿体影响较大的褶皱、断层和破碎带的性质、规模、产状、发育先后次序、分布规律以及对矿体的破坏程度和对矿石质量的影响,详细查明节理裂隙的性质、产状、分布规律、发育层位、地段及程度。 4.3.1.3.2 对位于复杂背斜(或向斜)中的矿床,应有工程控制褶皱形态和产状。 4.3.1.3.3 对影响矿层边界的断层产状宜有工程控制。 4.3.1.3.4 对位于飞来峰(构造推覆体)中的石灰岩矿体,宜有深部工程控制主推覆断裂,详细查明矿区内推覆体。 4.3.1.4 岩浆岩 研究岩浆岩的岩性特征、侵入时代、岩体与围岩的接触关系,详细查明岩浆岩体(包括脉岩)的种类、形态、规模、产状,研究岩浆岩对矿体的破坏程度和对矿石质量的影响。 4.3.1.5 变质岩 详细查明变质岩的种类、形态、规模、产状、矿物成分、化学成分、分布规律,研究变质岩的岩性特征、变质矿物组成,研究变质作用的性质、范围以及与成矿的关系,对矿体破坏程度和对矿石质量的影响。 4.3.2 矿体地质 4.3.2.1 矿体特征 在详查控制的基础上,采用的工程间距是探明资源量的工程间距,详细查明矿体(层)数量、空间位置、分布规律、形态规模、产状、厚度及其变化规律。沿矿体倾向上,用钻探工程详细查明拟开采底界以上矿体顶底板界线。 4.3.2.2 矿体夹石岩溶、覆盖层和围岩 4.3.2.2.1 夹石 详细查明夹石的数量种类形态、规模、厚度、空间分布、产状、化学成分、矿物成分、结构构造。对水泥用石灰岩矿层中夹有多层白云岩、白云岩化石灰岩以及矿体内白云质团块分布较多且无规律,稀密变化大时,地表应采用加密取样工程详细圈定其范围,宜对其延深加密钻探控制。对水泥用内陆河湖相沉积砂岩和泥岩矿床中的砾石夹层,应通过加密工程圈定,详细查明与矿层界线。 4.3.2.2.2 岩溶 基本查明石灰岩岩溶的形态、规模、分布范围和变化规律,岩溶的充填程度.充填物种类、矿物成分、化学成分以及对矿石质量和开采的影响。水泥用石灰岩中发育大量岩溶,特别是溶洞中有大量黏土充填时,需要用钻探和地球物理勘探手段对其空间形态、位置及充填物进行适当控制。 4.3.2.2.3 覆盖层 详细查明覆盖层的厚度变化,编制厚度大于2m的覆盖层等厚线图。对矿体覆盖层厚度大,地表难以取样时,可以在探明资源量分布地段采用浅钻代替槽探控制矿体,工程间距按相应勘查类型一般适当加密。 4.3.2.2.4 围岩 大致查明矿体围岩的种类、矿物成分结构、构造、主要化学成分和接触关系。 4.3.3 矿石特征 4.3.3.1 详细查明矿物成分、结构、构造及矿石类型、品级、所占比例和空间分布规律;详细查明矿石化学成分及有用、有害组分在矿床和矿体中的空间变化规律。 4.3.3.2 详细查明矿石风化带的深度、分布范围、产出特征,研究风化作用对矿石质量的影响。 4.3.3.3 对水分较高、塑性指数较大的黏土质和硅质原料矿床,应详细查明其含水率或塑性指数。 4.3.4 矿石加工技术试验要求 4.3.4.1 熔剂用、电石用石灰岩加工技术试验要求 4.3.4.1.1 耐磨、耐压。冶金工业用作熔剂的石灰岩一般做此项试验。详查阶段已做过试验的可不做同类试验。 4.3.4.1.2 煅烧试验。黑色熔剂用、电石用石灰岩烧石灰一般做此项试验。一般采用半工业规模试验。 4.3.4.1.3 水洗试验。通过水洗试验确定是否增加洗矿设备,目的是提高矿石质量,确保矿石经破碎、磨矿后能满足要求。 4.3.4.2 水泥原料工艺性能试验要求 4.3.4.2.1 应通过试验验证新类型矿石利用的可能性,需进行试验时,应在勘探阶段进行,对新类型矿石应提前进行,原料工艺性能试验应进行实验室规模试验,新的原料品种还应进行半工业规模试验,由主体设计单位根据原料资源条件和生产方法等编制取样设计书,取样设计书应包括样品种类、质量要求和样品重量,试样应具有代表性。 4.3.4.2.2 在原料工艺性能试验项目中,应包括可磨性、磨蚀性、易磨性等试验,采用辊式磨时,宜进行辊式磨磨蚀性和易磨性试验,对湿黏性物料宜做塑性指数试验。按照GB 50295执行。 4.3.5 开采技术条件 4.3.5.1 水文地质 4.3.5.1.1 详细查明矿床的含(隔)水层的水文地质特征和地下水的补给、径流、排泄条件,主要构造破碎带、风化层的分布和富水性,及与其他各含水层和地表水体的水力联系程度;进一步研究岩溶的分布和富水性;详细查明主要充水含水层的富水性,地下水径流特征、水头高度、水文地质边界,地表水体的水文特征及其对矿床开采的影响;详细调查老窿采空区的分布及积水情况;确定矿床主要充水因素、充水方式及途径;确定矿床水文地质勘查类型,评价水文地质条件的复杂程度。 4.3.5.1.2 对位于地下水位以上的矿床,收集气象资料,详细调查勘查区及其附近地表水体和当地最高洪水位标高,调查地表汇水边界和面积。 4.3.5.1.3 对位于地下水位以下的矿床,除上述工作外,还应详细查明含(隔)水层产状、厚度、分布、构造破碎带发育程度和含水性,进一步研究岩溶发育特征(岩溶形态、发育程度及分布规律),详细研究地下水的补给、径流、排泄条件,确定矿坑充水因素,预测计算首采地段或第一开采水平的矿坑涌水量。按照GB/T 12719执行。 4.3.5.1.4 对矿坑水综合利用的可能性做出评价,指出供水水源方向。 4.3.5.1.5 对水文地质条件特别复杂的矿床,应进行专门的水文地质工作。 4.3.5.2 工程地质 4.3.5.2.1 详细研究矿体和围岩的工程地质条件,采样测试矿石、围岩的物理力学性质。详细查明工程地质岩组的岩性、厚度、分布及组合特征,查明各类结构面(断层、节理裂隙、软弱层等)发育程度、分布及组合特征,查明岩石强风化层的发育深度与分布,调查周边开采矿山的主要工程地质问题,确定工程地质勘查类型,评价工程地质条件的复杂程度。 4.3.5.2.2 结合矿山工程建设的需要,对露天采场边坡的稳定性做出评价,提出最终边坡角的建议,预测可能发生的主要工程地质问题,并提出防治措施建议。 4.3.5.2.3 对适于露天开采的矿床,要研究矿体覆盖层的岩性厚度、分布规律及与矿体的界线,并确定剥采比。 4.3.5.2.4 对工程地质条件复杂的矿床,应进行专门的工程地质勘查。 4.3.5.3 环境地质 4.3.5.3.1 详细调查勘查区地震活动历史情况及新构造活动特征,对矿床的稳定性做出评价。 4.3.5.3.2 调查勘查区崩塌、滑坡、泥石流、地表塌陷等地质灾害情况,调查地表水和地下水质量及其他有害物质的含量;对矿床开采前的地质环境质量做出评述。对矿床开采中可能造成的地质环境影响做出预测评价,应提出防治措施建议。按GB 18306执行。 4.3.6 综合勘查、综合评价 4.3.6.1 根据勘查区所在地的工业需求,宜遵循优质优用和充分利用资源的原则,综合勘查石灰质原料、硅质原料和黏土质原料,详细查明共生矿产矿体特征、矿石质量及围岩特征,对其工业利用性做出评价。具体按照GB/T 25283执行。 4.3.6.2 对水泥用石 灰岩矿床中CaO含量低于45%的石灰质原料,应考虑与高品位矿石配矿使用的可能性,特别是对低钙高硅的泥灰岩,应详细查明。 4.3.6.3 对水泥用石灰岩矿床中的夹层、围岩及覆盖层,以及裂隙土、岩溶充填物等,应评价其综合利用的可能性。 4.3.6.4 对达不到熔剂用、电石用和水泥用石灰岩质量指标要求,应评价其用作建筑用石灰岩的可能性。 4.3.6.5 对与硅质原料矿共生的洪积冲积黏土矿床,应基本查明硅质原料矿体和黏土质原料矿体的形态和相互关系。 5 勘查控制程度 5.1 勘查类型的确定 5.1.1 勘查过程中应合理确定勘查类型,以便确定勘查工程间距和部署勘查工程,对矿床进行有效的控制,对矿体的连续性进行有效查定。 5.1.2 应根据矿床中占60%以上资源量的主矿体(一个或几个矿体)的地质特征来确定勘查类型。当不同的主矿体或同一主矿体的不同地段,其地质特征和勘查程度差别很大时,也可划分为不同的勘查类型。由于地质因素的复杂性,允许有过渡类型存在。 5.1.3 普查阶段矿体的基本特征尚未查清,难以确定勘查类型,但有类比条件的,可与同类矿床类比,初步确定勘查类型;详查阶段应根据影响勘查类型的主要地质因素确定勘查类型;勘探阶段应根据影响勘查类型的主要地质因素的变化情况验证勘查类型,经验证不合理的,应调整勘查类型。 5.1.4 石灰岩矿床勘查类型划分的主要地质因素由矿体内部结构复杂程度、矿体厚度稳定程度、构造复杂程度、岩浆岩发育程度、岩溶发育程度组成。依据上述因素,将石灰岩矿床划分为3个勘查类型,见附录B。 5.1.5 水泥配料类矿床勘查类型划分的主要因素由矿体规模、矿体形态及内部结构、矿体厚度稳定程度构造复杂程度、岩浆岩发育程度组成。依据上述因素,将水泥配料类矿床划分为3个勘查类型,参见附录C。 5.2 勘查工程间距的确定 5.2.1 矿床勘查时应根据勘查类型合理确定勘查工程间距。探明、推断资源量的勘查工程间距,一般分别在基本勘查工程间距的基础上加密和放稀1倍,但不限于1倍,以满足相应勘查研究程度要求为准则。原则上某一矿体确定为某种勘查类型(Ⅲ类型除外),应能以相应勘查类型的基本勘查工程间距连续布置3条及以上勘查线且每条线上有连续2个及以上工程见矿。通常采用与同类矿床类比的方法。特征相近的可用同一个工程间距。也可根据已完工的勘查工程成果,运用地质统计学方法,论证工程分布的合理性。 5.2.2 勘查深度一般不低于矿区最低侵蚀基准面标高;低于最低侵蚀基准面标高时,勘查深度应结合市场需求及开发利用的可能性论证确定。 5.2.3 勘查工程间距。石灰岩矿床勘查工程间距参见附录B。水泥配料类矿床勘查工程间距参见附录C。 5.3 矿床控制程度 5.3.1 普查阶段 地表矿体用取样工程稀疏控制,矿体延深用少量钻探工程验证,勘查工程部署应考虑后续工作的利用。通过稀疏的工程控制和验证矿体,应估算推断资源量,提出具有工业远景的可供详查的勘查区。 5.3.2 详查阶段 通过系统的取样工程加以控制,基本确定主要矿体的连续性。对勘查区内矿体的总体分布、矿体出露地表的边界及延深应有工程控制。根据系统取样工程圈定矿体,并估算控制和推断资源量。资源量比例一般要求参见附录D。 |
联系我们
|
微信联系客服
![]() |
关于我们 | 联系我们 | 收费付款 | ||
版权所有: 中译悦尔(北京)翻译有限公司 2008-2040 | ||
全国免费电话:800-810-5431 电话:010-8572 5110 传真:010-8581 9515 | ||
Email: bz@bzfyw.com | |
||
本页关键词: | ||
DZ/T 0213-2020, DZ 0213-2020, DZT 0213-2020, DZ/T0213-2020, DZ/T 0213, DZ/T0213, DZ0213-2020, DZ 0213, DZ0213, DZT0213-2020, DZT 0213, DZT0213 |